40th Street Portal, West Philadelphia
Replace the entire Routes 10/11/13/15/34/36 trolley fleet with new low-floor, accessible vehicles. Includes accessible station rebuilds along the West Philadelphia subway-surface lines.
Philly doesn't publish eviction filings, so this uses demolition permits as the closest proxy for housing stock loss in the immediate area. 15 permits found.
Manually curated, not a live feed. Refreshed each budget cycle (annual). Locations are approximate for line-wide projects (we plot the project at the line midpoint). Funding amounts are total project cost, not annual spend.